24th & Vermont Utilities Replacement
Closed · Illinois · Last reported Oct 2024
Source: Dodge USA
Project consists of installing 381 feet of new 8 water main, 318 feet of new 12 storm sewer, 2 manholes, 2 inlets, PCC pavement, PCC sidewalk, PCC driveways and related items.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Car parking, Power Transmission, Road, Government, Automotive, Power Generation (CCGT)
- Location
- Quincy, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 24th & Vermont Utilities Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of installing 381 feet of new 8 water main, 318 feet of new 12 storm sewer, 2 manholes, 2 inlets, PCC pavement, PCC sidewalk, PCC driveways and related items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Quincy |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Car parking, Power Transmission, Road, Government, Automotive, Power Generation (CCGT) |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
