24th Street (Ave A to Ave B) Pavement Replacement
Sector: Water Supply and Storage • Location: Yuma, Arizona, United States of America
Source: Dodge
The proposed pavement rehabilitation project consists in removing an identified amount of the existing Asphalt Concrete (AC) pavement and base material by milling and rebuilding the pavement section with and identified amount of AC pavement. The project includes improvements to water utility services, stormwater drainage facilities, repairs to the curbs and gutters as necessary at various location
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Car parking, Road, Cement, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Commercial, Automotive, Manufacturing (Industrial)
- Location
- Yuma, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 24th Street (Ave A to Ave B) Pavement Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed pavement rehabilitation project consists in removing an identified amount of the existing Asphalt Concrete (AC) pavement and base material by milling and rebuilding the pavement section with and identified amount of AC pavement. The project includes improvements to water utility services, stormwater drainage facilities, repairs to the curbs and gutters as necessary at various locations throughout the project. The project will improve sidewalks, sidewalk ramps and driveways at var... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Yuma |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Car parking, Road, Cement, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Commercial, Automotive, Manufacturing (Industrial) |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
