24th Street (Avenue 3E to Avenue 4E) Water Main Extension
Pre-design · Arizona · Last reported Jul 2025
Source: Dodge
Install approximately 6,100 linear feet of 12" PVC waterline along 24th Street from Avenue 3E to Avenue 4E, and south across I-8 to Gila Ridge Road. Requires a jack-and-bore installed casing across the interstate. Fire hydrant and service locations will be determined based on the final alignment selected and adjacent property needs.
- Status
- Prospective
- Sector
- Water Supply and Storage, Raw Materials, Road, Government, Commercial
- Location
- Yuma, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 24th Street (Avenue 3E to Avenue 4E) Water Main Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Install approximately 6,100 linear feet of 12" PVC waterline along 24th Street from Avenue 3E to Avenue 4E, and south across I-8 to Gila Ridge Road. Requires a jack-and-bore installed casing across the interstate. Fire hydrant and service locations will be determined based on the final alignment selected and adjacent property needs. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Yuma |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Road, Government, Commercial |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
