25-07 Watertown Plank Rd & N 115th St Utilities & Paving
Sector: Water Supply and Storage • Location: Wauwatosa, Wisconsin, United States of America
Source: Dodge
Under this proposal, the Contractor shall furnish all labor, materials, supplies, equipment, tools and other services necessary for storm sewer construction, water main construction, sanitary sewer, asphalt repaving and reconstruction including grading, concrete curb and gutter replacement, asphalt pavement, traffic signals, porous asphalt, pavement markings, street lighting, and work incidental t
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Road, Waste Processing and Treatment, Commercial, Power Transmission, Power Generation (CCGT)
- Location
- Wauwatosa, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 25-07 Watertown Plank Rd & N 115th St Utilities & Paving
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Under this proposal, the Contractor shall furnish all labor, materials, supplies, equipment, tools and other services necessary for storm sewer construction, water main construction, sanitary sewer, asphalt repaving and reconstruction including grading, concrete curb and gutter replacement, asphalt pavement, traffic signals, porous asphalt, pavement markings, street lighting, and work incidental thereto in portions of: Watertown Plank Road from N. 124th Street to 500' east of N. 113th Street ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Wauwatosa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Road, Waste Processing and Treatment, Commercial, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
