250 MW / 500 MWh Battery Energy Storage System (BESS) Project
Sector: Energy Storage • Location: Tamil Nadu, India
Source: Business Standard
Pace Digitek secured an EPC and long-term O&M contract from NLC India Renewables for implementing a 250 MW / 500 MWh BESS project in Tamil Nadu. The contract includes design, engineering, manufacturing-linked supply, installation, testing, commissioning, and associated civil, structural, and infrastructure works across multiple locations in Tamil Nadu, along with 12-year comprehensive Operations &
- Status
- Closed
- Sector
- Energy Storage, Manufacturing (Industrial)
- Location
- Tamil Nadu, India
- Updated
- 22 Jul 2026
- Source
- Business Standard
ConstructChat
Ask ConstructChat about 250 MW / 500 MWh Battery Energy Storage System (BESS) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Pace Digitek secured an EPC and long-term O&M contract from NLC India Renewables for implementing a 250 MW / 500 MWh BESS project in Tamil Nadu. The contract includes design, engineering, manufacturing-linked supply, installation, testing, commissioning, and associated civil, structural, and infrastructure works across multiple locations in Tamil Nadu, along with 12-year comprehensive Operations & Maintenance services. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Tamil Nadu |
Source
Source | Business Standard |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Manufacturing (Industrial) |
Article published date | 2026-05-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
