logo
ProjectCompleted

250 MW Solar Power Project

Completed · Rajasthan · Last reported Mar 2025

Source: Groww

Adani Green Energy's wholly-owned step-down subsidiary, Adani Green Energy Twenty Five Limited, has commissioned a 250 MW solar power project in Rajasthan, located at Badi Sid and Kalyan Ki Sid.

Status
Closed
Sector
Solar, Power Generation (CCGT)
Location
Rajasthan, India
Updated
22 Jul 2026
Source
Groww

ConstructChat

Ask ConstructChat about 250 MW Solar Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “250 MW Solar Power Project” is an infrastructure initiative in the Solar sector, located in Rajasthan, India. Taiyo aggregates data on it from Groww.

Participants

Not available for this record.

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Adani Green Energy's wholly-owned step-down subsidiary, Adani Green Energy Twenty Five Limited, has commissioned a 250 MW solar power project in Rajasthan, located at Badi Sid and Kalyan Ki Sid.

Location

Country

India

State

Rajasthan

Source

Source

Groww

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT)

Article published date

2025-03-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project