250 MW/500 MWh Battery Energy Storage System (BESS) Project
Sector: Energy Storage • Location: Maithon, Jharkhand, India
Source: Mercomindia.com
The Damodar Valley Corporation (DVC) has invited bids to set up a 250 MW/500 MWh battery energy storage system (BESS) project in Maithon, Jharkhand. This project is part of DVC's plan to install a cumulative 500 MW/1,000 MWh BESS projects in Jharkhand and West Bengal, focusing on design, engineering, installation, testing, and commissioning.
- Status
- Prospective
- Sector
- Energy Storage
- Location
- Maithon, Jharkhand, India
- Updated
- 22 Jul 2026
- Source
- Mercomindia.com
ConstructChat
Ask ConstructChat about 250 MW/500 MWh Battery Energy Storage System (BESS) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Damodar Valley Corporation (DVC) has invited bids to set up a 250 MW/500 MWh battery energy storage system (BESS) project in Maithon, Jharkhand. This project is part of DVC's plan to install a cumulative 500 MW/1,000 MWh BESS projects in Jharkhand and West Bengal, focusing on design, engineering, installation, testing, and commissioning. |
Location
Country | India |
State | Jharkhand |
City | Maithon |
Source
Source | Mercomindia.com |
URL |
More Details
Record type | Project |
Sector | Energy Storage |
Article published date | 2025-04-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
