25016 Amlbaml Aml
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
he affected section of ditch approx. 80LF will be removed and replaced with 4 flat bottom Class III Ditch. Grates will be removed and replaced after deposited sediment has been removed and modifications complete. To prevent migration of Class III aggregate into the concrete channel, a barrier for aggregate retention will be installed at the interface of the two types of ditch. Sediment deposited i
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Cement, Government, Residential
- Location
- Jonancy, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 25016 Amlbaml Aml
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | he affected section of ditch approx. 80LF will be removed and replaced with 4 flat bottom Class III Ditch. Grates will be removed and replaced after deposited sediment has been removed and modifications complete. To prevent migration of Class III aggregate into the concrete channel, a barrier for aggregate retention will be installed at the interface of the two types of ditch. Sediment deposited in the yard will also be removed to restore grade and drainage. The project limits are 3.37 acres ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Jonancy |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Cement, Government, Residential |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
