logo

2510 Hampshire Gate Commercial Addition and Alterations

Sector: Commercial • Location: Oakville, Ontario, Canada

Source: Dodge USA

Project
Planning Schematics

The proposed development is for a one-storey 535 square metre addition to an existing commercial development property, and it will be located between the current Value Village and St. Louis Bar & Grill. An additional 245 square metres of patio space for tenants is proposed, as an existing patio is being removed for the proposed one-way drive aisle for service vehicles along west property line. Rec

Status
Prospective
Sector
Commercial, Car parking, Automotive, Manufacturing (Industrial)
Location
Oakville, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2510 Hampshire Gate Commercial Addition and Alterations

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2510 Hampshire Gate Commercial Addition and Alterations” is an infrastructure initiative in the Commercial sector, located in Oakville, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed development is for a one-storey 535 square metre addition to an existing commercial development property, and it will be located between the current Value Village and St. Louis Bar & Grill. An additional 245 square metres of patio space for tenants is proposed, as an existing patio is being removed for the proposed one-way drive aisle for service vehicles along west property line. Reconfigure existing parking lot to accommodate the proposed addition and provide 98 parking space f...

Budget

Location

Country

Canada

State

Ontario

City

Oakville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Car parking, Automotive, Manufacturing (Industrial)

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project