2560226 - Mullycagh Upper , Co. Wicklow
One of 10,000+ projects Taiyo tracks in Ireland.
development which will consist of the construction of a Solar PV development, a Battery Energy Storage System facility (BESS) and all ancillary works on a ca. 65.4 ha site consisting of:
(I) Solar PV panels laid out in arrays across the Site; (ii)A 38kV substation building ((13.8 (l) and 7.4 (w)) and associated compound area, (iii)a transformer unit (ca. 5.8m x ca. 8.45m) and associated bund
- Status
- Prospective
- Sector
- Energy Storage, Commercial, Power Generation (CCGT), Telecommunications, Solar
- Location
- Ireland
- Updated
- 19 Nov 2026
- Source
- Ireland
ConstructChat
Ask ConstructChat about 2560226 - Mullycagh Upper , Co. Wicklow
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | incompleted application |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | development which will consist of the construction of a Solar PV development, a Battery Energy Storage System facility (BESS) and all ancillary works on a ca. 65.4 ha site consisting of: (I) Solar PV panels laid out in arrays across the Site; (ii)A 38kV substation building ((13.8 (l) and 7.4 (w)) and associated compound area, (iii)a transformer unit (ca. 5.8m x ca. 8.45m) and associated bund; (iv)192 number Battery Energy Storage System units comprising 22 modules (ca. 3.1m x ca.3.1m); (iv)6 MV Skid/Power Hubs (ca. 9.45m x ca.2.1m), (v)24 number inverter units (ca. 3m x ca.2.6m); (vi)Upgrade of 1 No. existing Site entrance; (vii)1 No. temporary construction compound; (viii)Electrical and communications cabling; (ix)Pole-mounted security cameras; (x)Perimeter security fencing (2m high) and security gates; (xi)Internal access tracks; and, (xii)All associated ancillary development, landscaping and reinstatement works The operational lifetime of the proposed development will be 40-years. A Natura Impact Statement will accompany the planning application |
Original sector | Construction |
Location
Country | Ireland |
Source
Source | Ireland |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Commercial, Power Generation (CCGT), Telecommunications, Solar |
Article published date | 2026-11-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
