logo
ProjectPre-Design

25Mw Solar Energy Facility

Sector: Solar • Location: Ramara, Ontario, Canada

Source: Dodge

Orillia Power Generation Corporation and the Chippewas of Rama First Nation are partnering to develop a 25Mw Solar Energy Facility in Ramara Township. The project is part of a proposal for Ontario's Long-Term 2 Energy Supply Request for Proposals. If awarded, construction would begin with a target commercial operation date in early 2029.

Status
Prospective
Sector
Solar, Power Generation (CCGT), Commercial
Location
Ramara, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 25Mw Solar Energy Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “25Mw Solar Energy Facility” is an infrastructure initiative in the Solar sector, located in Ramara, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Orillia Power Generation Corporation and the Chippewas of Rama First Nation are partnering to develop a 25Mw Solar Energy Facility in Ramara Township. The project is part of a proposal for Ontario's Long-Term 2 Energy Supply Request for Proposals. If awarded, construction would begin with a target commercial operation date in early 2029.

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Ramara

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Commercial

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project