2700 E Sidewalk Phase 1
Sector: Commercial • Location: Holladay, Utah, United States of America
Source: Dodge USA
The Work generally includes, but is not limited to, the following: demolition, grading, roadbase, concrete driveways, curb & gutters, and sidewalks, retaining walls less than 4-ft in height, noticing residents, and asphalt patching. The location of the work is: 2700 E between 3900 S and Lincoln Lane, Holladay, Utah.
- Status
- Closed
- Sector
- Commercial, Cement, Road, Car parking, Government, Automotive
- Location
- Holladay, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2700 E Sidewalk Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work generally includes, but is not limited to, the following: demolition, grading, roadbase, concrete driveways, curb & gutters, and sidewalks, retaining walls less than 4-ft in height, noticing residents, and asphalt patching. The location of the work is: 2700 E between 3900 S and Lincoln Lane, Holladay, Utah. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Holladay |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Cement, Road, Car parking, Government, Automotive |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
