272 MW Wind Project Acquisition in Romania
Sector: Power Generation (CCGT) • Location: Romania
Source: The Diplomat Bucharest
Verbund Wind Power Romania has acquired a fully developed 272 MW wind project from Monsson, which is located in Caras-Severin County. The project is at the 'Ready to Build' stage and is expected to enter construction in 2026, with an estimated annual generation of approximately 569 GWh.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Wind
- Location
- Romania
- Updated
- 22 Jul 2026
- Source
- The Diplomat Bucharest
ConstructChat
Ask ConstructChat about 272 MW Wind Project Acquisition in Romania
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Verbund Wind Power Romania has acquired a fully developed 272 MW wind project from Monsson, which is located in Caras-Severin County. The project is at the 'Ready to Build' stage and is expected to enter construction in 2026, with an estimated annual generation of approximately 569 GWh. |
Original sector | Energy |
Location
Country | Romania |
Source
Source | The Diplomat Bucharest |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind |
Article published date | 2025-04-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
