logo

272 MW Wind Project Acquisition in Romania

Sector: Power Generation (CCGT) • Location: Romania

Source: The Diplomat Bucharest

Project
Planned

Verbund Wind Power Romania has acquired a fully developed 272 MW wind project from Monsson, which is located in Caras-Severin County. The project is at the 'Ready to Build' stage and is expected to enter construction in 2026, with an estimated annual generation of approximately 569 GWh.

Status
Prospective
Sector
Power Generation (CCGT), Wind
Location
Romania
Updated
22 Jul 2026
Source
The Diplomat Bucharest

ConstructChat

Ask ConstructChat about 272 MW Wind Project Acquisition in Romania

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “272 MW Wind Project Acquisition in Romania” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Romania. Taiyo aggregates data on it from The Diplomat Bucharest.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Verbund Wind Power Romania has acquired a fully developed 272 MW wind project from Monsson, which is located in Caras-Severin County. The project is at the 'Ready to Build' stage and is expected to enter construction in 2026, with an estimated annual generation of approximately 569 GWh.

Original sector

Energy

Location

Country

Romania

Source

Source

The Diplomat Bucharest

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Wind

Article published date

2025-04-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project