logo

27th St Complete Streets Project

Sector: Water Supply and Storage • Location: Oakland, California, United States of America

Source: Dodge

Project
Bid Results

The City of Oakland proposes to improve the existing bike and pedestrian facilities on 27th Street between Telegraph Avenue and Harrison Street, and Bay Place between Harrison Street and Grand Avenue. The proposed improvements include curb ramps, storm drain systems, concrete-separated protected bike lanes, buffered Class II bike lanes, pedestrian refuges, transit boarding islands, signage and str

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Road, Car parking, Commercial, Automotive, Cement, Government
Location
Oakland, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 27th St Complete Streets Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “27th St Complete Streets Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Oakland, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City of Oakland proposes to improve the existing bike and pedestrian facilities on 27th Street between Telegraph Avenue and Harrison Street, and Bay Place between Harrison Street and Grand Avenue. The proposed improvements include curb ramps, storm drain systems, concrete-separated protected bike lanes, buffered Class II bike lanes, pedestrian refuges, transit boarding islands, signage and striping, traffic signal upgrades, and landscaping.

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Oakland

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Road, Car parking, Commercial, Automotive, Cement, Government

Article published date

2025-08-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project