2.8 GW CCGT Power Plant Project at Tung Hsiao
Sector: Power Generation (CCGT) • Location: Taiwan
Source: Enerdata
A 2.8 GW combined cycle gas turbine (CCGT) power plant project at the Tung Hsiao power plant, operated by Taiwan Power Company (Taipower). The project involves installation of five units with gas turbines as core technology, including three M501J gas turbines supplied by Mitsubishi Power for the first phase. The units are expected to be commissioned sequentially between 2030 and 2031.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | awarded |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | A 2.8 GW combined cycle gas turbine (CCGT) power plant project at the Tung Hsiao power plant, operated by Taiwan Power Company (Taipower). The project involves installation of five units with gas turbines as core technology, including three M501J gas turbines supplied by Mitsubishi Power for the first phase. The units are expected to be commissioned sequentially between 2030 and 2031. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
