28th Street Utility Improvements
Sector: Water Supply and Storage • Location: Ogden, Utah, United States of America
Source: Dodge USA
The Work generally includes, but is not limited to, the following: Install approx. 780 ft of 29" x45" elliptical RCP Storm main, 560 ft of 15" RCP storm main, storm combo boxes and catch basins. Install approx. 1,030 ft of 8" PVC water main, 1,200 ft curb and gutter, and 5,800 SF concrete flatwork
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT)
- Location
- Ogden, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 28th Street Utility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work generally includes, but is not limited to, the following: Install approx. 780 ft of 29" x45" elliptical RCP Storm main, 560 ft of 15" RCP storm main, storm combo boxes and catch basins. Install approx. 1,030 ft of 8" PVC water main, 1,200 ft curb and gutter, and 5,800 SF concrete flatwork |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Ogden |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
