2C8 Cavalier - Runway 16/34 Rehabilitation
Sector: Water Supply and Storage • Location: Cavalier, North Dakota, United States of America
Source: Dodge
Project work consists of but is not limited to the following: Runway 16/34 Rehabilitation will consist of pavement milling, excavation, demolition, grading, earthwork, paving, pavement marking, ditch cleaning, storm drainage, seeding, and mulching. Construction for this project is to take place over 21 calendar days in the Summer of 2025. Permanent pavement markings shall be installed over 2 calen
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Manufacturing (Industrial), Road, Commercial
- Location
- Cavalier, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2C8 Cavalier - Runway 16/34 Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project work consists of but is not limited to the following: Runway 16/34 Rehabilitation will consist of pavement milling, excavation, demolition, grading, earthwork, paving, pavement marking, ditch cleaning, storm drainage, seeding, and mulching. Construction for this project is to take place over 21 calendar days in the Summer of 2025. Permanent pavement markings shall be installed over 2 calendar days after the pavement has been allowed for cure for a minimum of 30 calendar days. (M&H #42... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Cavalier |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Manufacturing (Industrial), Road, Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
