logo
ProjectAwarded

2GW Sea Link HVDC Project

One of 10,000+ projects Taiyo tracks in United Kingdom.

Source: MSN

National Grid has selected Sumitomo Electric for the 2GW Sea Link HVDC project, which involves the development of a high-voltage direct current (HVDC) link with a capacity of 2 gigawatts. This project aims to enhance the electricity transmission infrastructure by connecting offshore and onshore grids efficiently.

Status
Closed
Sector
Power Transmission, Power Generation (CCGT)
Location
United Kingdom
Updated
22 Jul 2026
Source
MSN

ConstructChat

Ask ConstructChat about 2GW Sea Link HVDC Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “2GW Sea Link HVDC Project” is an infrastructure initiative in the Power Transmission sector, located in United Kingdom. Taiyo aggregates data on it from MSN.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

National Grid has selected Sumitomo Electric for the 2GW Sea Link HVDC project, which involves the development of a high-voltage direct current (HVDC) link with a capacity of 2 gigawatts. This project aims to enhance the electricity transmission infrastructure by connecting offshore and onshore grids efficiently.

Original sector

Energy

Location

Country

United Kingdom (UK)

Source

Source

MSN

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT)

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project