2nd Avenue Infrastructure Improvement
Sector: Commercial • Location: Hanna, Alberta, Canada
Source: Dodge USA
The main items of Work of this Contract include the following: 1. Remove and Replace PVC SDR 35 Sanitary Main 500 m 2. Remove and Replace PVC C900 Water Main 500 m 3. Asphaltic Hot Mix A (60 mm) and Mix B (40 mm) 8,000 m2 4. Remove and Replace 450 mm SDR35 Storm Main 400 m 5. Install Mono Walk Concrete Fill 1,800 m2
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Waste Processing and Treatment, Cement, Road, Government
- Location
- Hanna, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2nd Avenue Infrastructure Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main items of Work of this Contract include the following: 1. Remove and Replace PVC SDR 35 Sanitary Main 500 m 2. Remove and Replace PVC C900 Water Main 500 m 3. Asphaltic Hot Mix A (60 mm) and Mix B (40 mm) 8,000 m2 4. Remove and Replace 450 mm SDR35 Storm Main 400 m 5. Install Mono Walk Concrete Fill 1,800 m2 |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Hanna |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Waste Processing and Treatment, Cement, Road, Government |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
