2nd E. Multi-Use Path
One of 10,000+ projects Taiyo tracks in South Carolina.
Source: Dodge
SCOPE OF WORK Winning bidder will construct a pervious, multi-use path, along the E. side of 2nd Street East, within the public right of way, from the S. side of E. Cooper Ave to the N. side of E. Indian Ave. Construction shall be in accordance with plans and specifications by Davis & Floyd Engineering and the approved encroachment permit from SCDOT.
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial), Road, Government
- Location
- Folly Beach, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2nd E. Multi-Use Path
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SCOPE OF WORK Winning bidder will construct a pervious, multi-use path, along the E. side of 2nd Street East, within the public right of way, from the S. side of E. Cooper Ave to the N. side of E. Indian Ave. Construction shall be in accordance with plans and specifications by Davis & Floyd Engineering and the approved encroachment permit from SCDOT. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Folly Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Road, Government |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
