logo
ProjectOngoing

2nd Life for Power Plants

Sector: Power Transmission • Location: Denmark, Germany, Sweden, Netherlands, Poland, Belgium

Source: EU Funding & Tenders Portal

The 2LIPP project will partially retrofit the Bornholm CHP plant with a scalable hybrid energy storage system consisting of three low-cost, storage technologies (novel molten hydroxide salt storage, lithium battery which is based on reused car batteries, and a flywheel, based on non-rare metals and with unprecedented lifetime), which all improve state-of-the art in their own way – also within sust

Status
Under Construction
Sector
Power Transmission, Power Generation (CCGT), Energy Storage, Electric Vehicles (EVs), Road, Automotive
Location
Denmark, Germany, Sweden, Netherlands, Poland, Belgium
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about 2nd Life for Power Plants

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “2nd Life for Power Plants” is an infrastructure initiative in the Power Transmission sector, located in Denmark, Germany, Sweden, Netherlands, Poland, Belgium. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ongoing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 2LIPP project will partially retrofit the Bornholm CHP plant with a scalable hybrid energy storage system consisting of three low-cost, storage technologies (novel molten hydroxide salt storage, lithium battery which is based on reused car batteries, and a flywheel, based on non-rare metals and with unprecedented lifetime), which all improve state-of-the art in their own way – also within sustainability. The technologies will be operated through an innovative management system (EMS) to charge and dispatch the hybrid storage system in the best way possible. The 2LIPP demonstration will serve as a proof-of-concept for a disruptive approach to transitioning traditional power and combined heat and power plants away from fossil fuels, while maintaining a secure supply of energy and stability of the electrical grid. The 2LIPP concept greatly reduces the costs of energy storage by reusing existing facilities at power plant sites. Also, the innovative combined operation of several technologies through the EMS allows for deployment of storage technologies in their relative ‘sweet-spots’ leading to optimal efficiencies and improves lifetimes. The low cost and high efficiency that stems from the 2LIPP approach will accelerate the availability of storage technologies and systems to bring about net zero in the electrical and heating sectors. Deploying hybrid storage with the 2LIPP concept can maintain the role of power plants as critical nodes in the grid, and enable these sites to provide grid stability at both short and long timescales, thus ensuring that Europe can integrate renewable energy without a rising risk of blackouts. The project also develops feasibility case studies for utility companies to serve possible road maps for utility companies to decide on the most viable investment for retrofitting their plants.

Location

Country

Denmark, Germany, Sweden, Netherlands, Poland, Belgium

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Energy Storage, Electric Vehicles (EVs), Road, Automotive

Article published date

2026-03-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project