logo

2nd Murray River Bridge Crossing in Australia

Sector: Automotive • Location: Echuca and Moama, Australia

Source: Highways Today

Project
Ongoing

Construction on a vital second river crossing between Victoria and New South Wales at Echuca and Moama is a step closer, following the awarding of the contract to McConnell Dowell Constructors (Australia) Pty Ltd. Stage 3 of the project includes new bridges over the Murray and Campaspe rivers and two new flood relief bridges. McConnell Dowell Constructors (Australia) has been announced as the cont

Project Information FAQ

Project Information

5 Q
The project “2nd Murray River Bridge Crossing in Australia” is an infrastructure initiative in the Automotive sector, located in Echuca and Moama, Australia. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Construction on a vital second river crossing between Victoria and New South Wales at Echuca and Moama is a step closer, following the awarding of the contract to McConnell Dowell Constructors (Australia) Pty Ltd. Stage 3 of the project includes new bridges over the Murray and Campaspe rivers and two new flood relief bridges. McConnell Dowell Constructors (Australia) has been announced as the contractor to build the new road between Echuca in Victoria and Moama in New South Wales, taking thousands of vehicles off the existing Murray River Bridge and better linking the two states. A new two-lane, two-way road north of the new Warren Street roundabout in Echuca to the Cobb Highway in Moama, is included in the Stage 3 build to be carried out by McConnell Dowell Constructors.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data