2nd Street Bar Screen Modification & Gate Replacement
Sector: Manufacturing (Industrial) • Location: Newport, Kentucky, United States of America
Source: Dodge USA
The project generally consists of, but is not limited to providing all labor, equipment, materials, supplies, tools, and supervision necessary to complete the removal and replacement of two (2) influent gates with new gates and two (2) effluent gates with stop logs, including the removal and shipment of the bar screen to manufacturer, as well as reinstallation once the manufacturer has completed a
- Status
- Closed
- Sector
- Manufacturing (Industrial), Seaport, Waste Processing and Treatment, Road, Government, Commercial, Water Supply and Storage
- Location
- Newport, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2nd Street Bar Screen Modification & Gate Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project generally consists of, but is not limited to providing all labor, equipment, materials, supplies, tools, and supervision necessary to complete the removal and replacement of two (2) influent gates with new gates and two (2) effluent gates with stop logs, including the removal and shipment of the bar screen to manufacturer, as well as reinstallation once the manufacturer has completed and shipped the bar screen back as shown on the Contract Documents prepared by GPD Group Engineers. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Newport |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Seaport, Waste Processing and Treatment, Road, Government, Commercial, Water Supply and Storage |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
