logo
ProjectCompleted

3 Falls Substation Project

One of 10,000+ projects Taiyo tracks in Utah.

Source: Citizen Portal AI

The 3 Falls substation was designed and brought online to serve the south end of the system and relieve load on the Clifton Wilson substation. Portions of the substation were built in-house, resulting in estimated savings of $3.5 million to $4.5 million compared with contracting the entire project.

Status
Closed
Sector
Power Generation (CCGT)
Location
Hurricane, Utah, United States of America
Updated
22 Jul 2026
Source
Citizen Portal AI

ConstructChat

Ask ConstructChat about 3 Falls Substation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “3 Falls Substation Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Hurricane, Utah, United States. Taiyo aggregates data on it from Citizen Portal AI.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 3 Falls substation was designed and brought online to serve the south end of the system and relieve load on the Clifton Wilson substation. Portions of the substation were built in-house, resulting in estimated savings of $3.5 million to $4.5 million compared with contracting the entire project.

Original sector

Energy

Location

Country

United States of America (USA)

State

Utah

City

Hurricane

Source

Source

Citizen Portal AI

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-11-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project