logo

30 Stockton Presidio Extension

Sector: Seaport • Location: San Francisco, California, United States of America

Source: SFMTA Projects

Project
Implementation / Construction

30 Stockton Presidio Extension Share this: Facebook Twitter LinkedIn Project Introduction In September, Muni 30 Stockton route is being extended from its current terminal in the Marina to Crissy Field in the Presidio. Service will be extended daily between 6:00 a.m. and 8:00 p.m. All other times, the 30 Stockton terminal will remain at Divisadero and Chestnut. In addition to the new terminal, stop

Project Information FAQ

Project Information

4 Q
The project “30 Stockton Presidio Extension” is an infrastructure initiative in the Seaport sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from SFMTA Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

implementation / construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

30 Stockton Presidio Extension Share this: Facebook Twitter LinkedIn Project Introduction In September, Muni 30 Stockton route is being extended from its current terminal in the Marina to Crissy Field in the Presidio. Service will be extended daily between 6:00 a.m. and 8:00 p.m. All other times, the 30 Stockton terminal will remain at Divisadero and Chestnut. In addition to the new terminal, stops will be added near Crissy Field East Beach and the Presidio Main Post. The East Beach stop will be a short walk from the Palace of Fine Arts. Project Goals: Replace 40-foot buses with 60-foot buses that will allow more room for customers to maintain distance onboard and reduce pass-ups Support operating larger buses on the 30 Stockton through one of the densest neighborhoods in North America, Chinatown.  This increased capacity is needed to support essential trips and is a fiscally responsible method to add more capacity through such an important neighborhood Allow Muni to operate larger buses on a route that experienced severe crowding pre-COVID, and now needs more space for social distancing Provide regional transit access to Crissy Field and the Presidio via direct connections to BART and Caltrain Maintain daily frequency between 10 and 20 minutes Map illustrates the 30 Stockton extension to The Presidio. The extension of the 30 Stockton will provide long-awaited transit access to The Presidio and Crissy Field from the east side of the City. Project Status Implementation / Construction Project Success On schedule Improvements Bus Routes and Rail Lines 8 Bayshore 19 Polk 22 Fillmore 28 19th Avenue 28R 19th Avenue Rapid 30 Stockton 45 Union/Stockton 49 Van Ness/Mission Contact Information Enrique Aguilar Enrique.Aguilar@SFMTA.com 415-646-2395

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data