300 East/Ramanee Dr/State St Pipeline Improvements
Sector: Water Supply and Storage • Location: Midvale, Utah, United States of America
Source: Dodge USA
(#24) 300 East to 700 East, 2,650 LF of Future 20-Inch Pipeline (Along 7200 South); (#25) Ramanee Drive to 300 East, 1,100 LF of Future 16-Inch Pipeline (Along 7200 South); State Street to Ramanee Drive (#26), 1,360 LF of Future 12-Inch Pipeline (Along 7200 South)
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment
- Location
- Midvale, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 300 East/Ramanee Dr/State St Pipeline Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | (#24) 300 East to 700 East, 2,650 LF of Future 20-Inch Pipeline (Along 7200 South); (#25) Ramanee Drive to 300 East, 1,100 LF of Future 16-Inch Pipeline (Along 7200 South); State Street to Ramanee Drive (#26), 1,360 LF of Future 12-Inch Pipeline (Along 7200 South) |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Midvale |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
