300 MW Solar Power Project at Barsingsar
Sector: Solar • Location: Bikaner, Rajasthan, India
Source: PSU Watch
NLC India Limited has commissioned the first phase of its 300 MW solar power project located at Barsingsar in Bikaner district of Rajasthan. The first phase with a capacity of 52.83 MW has been declared commercially operational following the receipt of the commissioning certificate from the Rajasthan Renewable Energy Corporation Limited.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | NLC India Limited has commissioned the first phase of its 300 MW solar power project located at Barsingsar in Bikaner district of Rajasthan. The first phase with a capacity of 52.83 MW has been declared commercially operational following the receipt of the commissioning certificate from the Rajasthan Renewable Energy Corporation Limited. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
