300 MW SOLAR POWER PROJECT UNDER CPSU SCHEME

Closed · Rajasthan

Source: India Investment Grid (IIG)

Information NHPC has come up with 300 MW SOLAR POWER PROJECT UNDER CPSU SCHEME with a ticket size of 1731.57 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project 300 MW Solar Power Project is being set up under CPSU Scheme, Phase-II, Tranche-III again

Status
Closed
Sector
Government, Manufacturing (Industrial), Power Generation (CCGT), Road, Solar, Biomass, Hydro, Wind
Location
Karnisar Bhatiyan, Rajasthan, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about 300 MW SOLAR POWER PROJECT UNDER CPSU SCHEME

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “300 MW SOLAR POWER PROJECT UNDER CPSU SCHEME” is an infrastructure initiative in the Government sector, located in Karnisar Bhatiyan, Rajasthan, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Company

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information NHPC has come up with 300 MW SOLAR POWER PROJECT UNDER CPSU SCHEME with a ticket size of 1731.57 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project 300 MW Solar Power Project is being set up under CPSU Scheme, Phase-II, Tranche-III against the total allocated capacity of 1000 MW to NHPC Limited by IREDA. NHPC is implementing the development of this project through EPC Contract for 300 MW Grid Connected Solar PV Project and transmission line for power evacuation to ISTS sub-station along with comprehensive O&M for 05 years. The power generated from the project shall be evacuated through Bikaner-II ISTS Substation for use by Government / Government entities through Distribution Companies [DISCOMS]. Only domestically manufactured Cells & Modules shall be used for setting up of Solar Plant as per the provision of CPSU Scheme.

Original sector

Electricity Generation

Procurement method

Budget

Location

Country

India

State

Rajasthan

City

Karnisar Bhatiyan

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Government, Manufacturing (Industrial), Power Generation (CCGT), Road, Solar, Biomass, Hydro, Wind

Article published date

2024-02-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project