300 MW Wind-Solar Hybrid Project in Mandsaur
Sector: Solar • Location: Mandsaur, Madhya Pradesh, India
Source: Saur Energy
A 300 MW wind-solar hybrid power project proposed by CESC Limited, located in Mandsaur, Madhya Pradesh, connected to the Inter-State Transmission System (ISTS). The project was tendered to procure 150 MW with an option for an additional 150 MW under a greenshoe clause. The tender was awarded to Purvah Green Power Private Limited, a wholly owned subsidiary of CESC.
- Status
- Prospective
- Sector
- Solar, Power Generation (CCGT), Wind
- Location
- Mandsaur, Madhya Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Saur Energy
ConstructChat
Ask ConstructChat about 300 MW Wind-Solar Hybrid Project in Mandsaur
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 300 MW wind-solar hybrid power project proposed by CESC Limited, located in Mandsaur, Madhya Pradesh, connected to the Inter-State Transmission System (ISTS). The project was tendered to procure 150 MW with an option for an additional 150 MW under a greenshoe clause. The tender was awarded to Purvah Green Power Private Limited, a wholly owned subsidiary of CESC. |
Original sector | Renewable Energy |
Location
Country | India |
State | Madhya Pradesh |
City | Mandsaur |
Source
Source | Saur Energy |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Wind |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
