300 MW/1,200 MWh Assured Peak Power Project by ACME Solar
Sector: Power Generation (CCGT) • Location: India
Source: SolarQuarter
Solar Energy Corporation of India (SECI) has signed a 25-year Power Purchase Agreement (PPA) with ACME Solar Holdings Limited for a 300 MW/1,200 MWh assured peak power project under its Firm and Dispatchable Renewable Energy (FDRE) Tranche-VII scheme. The project is designed to supply four hours of assured peak electricity during non-solar hours while maintaining a minimum annual availability of 8
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | awarded |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Solar Energy Corporation of India (SECI) has signed a 25-year Power Purchase Agreement (PPA) with ACME Solar Holdings Limited for a 300 MW/1,200 MWh assured peak power project under its Firm and Dispatchable Renewable Energy (FDRE) Tranche-VII scheme. The project is designed to supply four hours of assured peak electricity during non-solar hours while maintaining a minimum annual availability of 85%. It will be connected through the Interstate Transmission System (ISTS) network and leverage existing night-time transmission connectivity in high solar irradiation regions. The project was secured through SECI’s tariff-based competitive bidding and e-reverse auction process at a tariff of ₹6.28 per unit. Commercial power supply is expected to commence by May 2028. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
