300 West I-215 Waterline Replacement
Sector: Water Supply and Storage • Location: Salt Lake City, Utah, United States of America
Source: Dodge USA
The Work of this Contract comprises all work associated with the construction of a new waterline crossing of I-215 at 300 West by directionally drilling approximately 500 feet of 20 DR17 HDPE casing with a 14-inch DR11 HDPE carrier pipe. An additional 100 feet of 10-inch DI pipe will be required to connect the HDPE pipe to existing pipelines.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Work of this Contract comprises all work associated with the construction of a new waterline crossing of I-215 at 300 West by directionally drilling approximately 500 feet of 20 DR17 HDPE casing with a 14-inch DR11 HDPE carrier pipe. An additional 100 feet of 10-inch DI pipe will be required to connect the HDPE pipe to existing pipelines. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
