300MW Wind Power Deal for Texas Data Center
The owner, status and timeline of this project. A free account opens every field.
Source: Stock Titan
Cipher Mining has secured a preliminary agreement with ENGIE North America to purchase up to 300 megawatts of clean energy from ENGIE's wind facilities for its data center in Texas. This strategic collaboration aims to alleviate transmission congestion and enhance grid stability by co-locating the data center with the wind project.
- Status
- Prospective
- Sector
- Wind, Data Center, Power Generation (CCGT)
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Stock Titan
ConstructChat
Ask ConstructChat about 300MW Wind Power Deal for Texas Data Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Cipher Mining has secured a preliminary agreement with ENGIE North America to purchase up to 300 megawatts of clean energy from ENGIE's wind facilities for its data center in Texas. This strategic collaboration aims to alleviate transmission congestion and enhance grid stability by co-locating the data center with the wind project. |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Stock Titan |
URL |
More Details
Record type | Project |
Sector | Wind, Data Center, Power Generation (CCGT) |
Article published date | 2025-05-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States
- Union Power Project El Dorado AR
- I-485 Charlotte Outer Loop, North Carolina
- Goethals Bridge Replacement Project, New York
- Northeast Supply Enhancement (NESE) Project
- Dominion Cove Point Liquefaction Project, Chesapeake Bay
- Starbucks Coffee Roasting Plant
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
