logo

305 MW Solar Project in Anantapur

Sector: Power Generation (CCGT) • Location: Anantapur, Andhra Pradesh, India

Source: SolarQuarter

Project
Awarded

Nextracker Inc. has signed an agreement with ReNew Private Limited to develop a 305 MW solar project in Anantapur, Andhra Pradesh, India. The project will utilize advanced solar tracking technology to increase energy yield and is part of India's push to expand renewable energy capacity.

Status
Closed
Sector
Power Generation (CCGT), Solar
Location
Anantapur, Andhra Pradesh, India
Updated
22 Jul 2026
Source
SolarQuarter

ConstructChat

Ask ConstructChat about 305 MW Solar Project in Anantapur

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “305 MW Solar Project in Anantapur” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Anantapur, Andhra Pradesh, India. Taiyo aggregates data on it from SolarQuarter.

Participants

Not available for this record.

Status

Original status

Awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Nextracker Inc. has signed an agreement with ReNew Private Limited to develop a 305 MW solar project in Anantapur, Andhra Pradesh, India. The project will utilize advanced solar tracking technology to increase energy yield and is part of India's push to expand renewable energy capacity.

Original sector

Energy

Location

Country

India

State

Andhra Pradesh

City

Anantapur

Source

Source

SolarQuarter

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar

Article published date

2025-05-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project