30MW Solar Farm in Gurun, Kedah
Sector: Solar • Location: Gurun, Kedah, Malaysia
Source: CarbonCredits.com
A 30-megawatt solar farm project in Gurun, Kedah, Malaysia, developed by SM01 Sdn Bhd consortium including Shizen Malaysia, Solarvest Asset Management, and HSS Engineering. The project reached financial close in November 2025 and is scheduled to begin commercial operations in 2027, supplying renewable energy to Google data centers.
- Status
- Closed
- Sector
- Solar, Raw Materials, Power Generation (CCGT), Commercial
- Location
- Gurun, Kedah, Malaysia
- Updated
- 22 Jul 2026
- Source
- CarbonCredits.com
ConstructChat
Ask ConstructChat about 30MW Solar Farm in Gurun, Kedah
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 30-megawatt solar farm project in Gurun, Kedah, Malaysia, developed by SM01 Sdn Bhd consortium including Shizen Malaysia, Solarvest Asset Management, and HSS Engineering. The project reached financial close in November 2025 and is scheduled to begin commercial operations in 2027, supplying renewable energy to Google data centers. |
Original sector | Energy |
Location
Country | Malaysia |
State | Kedah |
City | Gurun |
Source
Source | CarbonCredits.com |
URL |
More Details
Record type | Project |
Sector | Solar, Raw Materials, Power Generation (CCGT), Commercial |
Article published date | 2025-12-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
