318 N 18TH Street CDBG Residential Rehabilitation
Sector: Power Transmission • Location: Fort Pierce, Florida, United States of America
Source: Dodge USA
The purpose of this Bid is to solicit qualified contractors to rehabilitate the property located at 318 N. 18th Street, Fort Pierce, FL 34950 as a part of the Community Development Block Grant (CDBG) Program. his project should be bid according to the housing rehabilitation specifications set forth below. Project Bid must be all inclusive. Replace Roof Repair/Replace fascia and soffit Replace main
- Status
- Closed
- Sector
- Power Transmission, Road, Residential, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Fort Pierce, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 318 N 18TH Street CDBG Residential Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of this Bid is to solicit qualified contractors to rehabilitate the property located at 318 N. 18th Street, Fort Pierce, FL 34950 as a part of the Community Development Block Grant (CDBG) Program. his project should be bid according to the housing rehabilitation specifications set forth below. Project Bid must be all inclusive. Replace Roof Repair/Replace fascia and soffit Replace main entry door Replace rear door and utility room door Master bathroom o Replace sink and vanity lig... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Fort Pierce |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Road, Residential, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
