31.82-Megawatt Photovoltaic Power Station in Stefan cel Mare
The owner, status and timeline of this project. A free account opens every field.
Source: Xinhua
A 31.82-megawatt photovoltaic power station built by China's Pinggao Group International Engineering Co., Ltd. in Stefan cel Mare, Calarasi County, Romania. The project took about 10 months to build and is expected to operate for 25 years, generating 42 million kilowatt-hours of electricity annually and reducing carbon dioxide emissions by 20,000 tonnes.
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT)
- Location
- Stefan cel Mare, Calarasi County, Romania
- Updated
- 22 Jul 2026
- Source
- Xinhua
ConstructChat
Ask ConstructChat about 31.82-Megawatt Photovoltaic Power Station in Stefan cel Mare
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 31.82-megawatt photovoltaic power station built by China's Pinggao Group International Engineering Co., Ltd. in Stefan cel Mare, Calarasi County, Romania. The project took about 10 months to build and is expected to operate for 25 years, generating 42 million kilowatt-hours of electricity annually and reducing carbon dioxide emissions by 20,000 tonnes. |
Original sector | Energy |
Location
Country | Romania |
State | Calarasi County |
City | Stefan cel Mare |
Source
Source | Xinhua |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in Romania
- Stada Arzneimittel Supply Chain and Packaging Facility, Turda, Romania
- Project Batar
- Beta Solar PV Park
- Romania UCEA Solar PV Park
- Alpha Solar PV Park
- Transport infrastructure rehabilitation in the Ungheni-Iasi cross-border area which aims at traffic streamline in the Sculeni border crossing point - 3,1,1 valori 3 indicatori neprecizati
- Green economy for greener local communities in Danube area
- Montana – Dolj : Better access-closer communities
