31st Line Paving 2020
Start · Ontario · Last reported May 2020
Source: Dodge USA
Paving of approximately 6500 metres of Township of Zorra road known as the 31st Line west of Embro at a 7-meter width. Two blocks from Road 78 to Road 88. These road sections will receive an initial course of 50 mm compacted HL8 followed by a 50mm compacted course of HL3. All asphalt shall be PGAC 58-28 with a minimum of 5.2% asphalt cement content. No recycled asphalt shall be permitted.
- Status
- Prospective
- Sector
- Road, Government, Commercial, Manufacturing (Industrial)
- Location
- Ingersoll, Ontario, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 31st Line Paving 2020
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Paving of approximately 6500 metres of Township of Zorra road known as the 31st Line west of Embro at a 7-meter width. Two blocks from Road 78 to Road 88. These road sections will receive an initial course of 50 mm compacted HL8 followed by a 50mm compacted course of HL3. All asphalt shall be PGAC 58-28 with a minimum of 5.2% asphalt cement content. No recycled asphalt shall be permitted. |
Procurement method |
Location
Country | Canada |
State | Ontario |
City | Ingersoll |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
