3.2 GW Offshore Transmission System PPP project
Financial close · Abu Dhabi
Source: InfraPPPWorld
The project involves the development of a 3.2 GW high-voltage direct current (HVDC) sub-sea transmission network in the MENA region. The Offshore transmission system will comprise two independent sub-sea HVDC links and converter stations.
- Status
- Closed
- Sector
- Power Generation (CCGT), Power Transmission, Oil and Gas, Road, Commercial
- Location
- Abu Dhabi, United Arab Emirates
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about 3.2 GW Offshore Transmission System PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | financial close |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the development of a 3.2 GW high-voltage direct current (HVDC) sub-sea transmission network in the MENA region. The Offshore transmission system will comprise two independent sub-sea HVDC links and converter stations. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | United Arab Emirates (UAE) |
State | Abu Dhabi |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Oil and Gas, Road, Commercial |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
