logo

32 Mile Road Technical Campus Data Center

Sector: Manufacturing (Industrial) • Location: Washington Township, Michigan, United States

Source: Planet Detroit

Project
Planned

A proposed data center and technical campus development on over 312 acres of land in Washington Township. The project involves rezoning the property to an Industrial – Research – Technology zoning district to allow for industrial and research facilities, including a data center. The proposal includes site-specific conditions and a reversion clause if the development is not completed within five ye

Status
Prospective
Sector
Manufacturing (Industrial), Data Center, Road
Location
Washington Township, Michigan, United States of America
Updated
22 Jul 2026
Source
Planet Detroit

ConstructChat

Ask ConstructChat about 32 Mile Road Technical Campus Data Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “32 Mile Road Technical Campus Data Center” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Washington Township, Michigan, United States. Taiyo aggregates data on it from Planet Detroit.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed data center and technical campus development on over 312 acres of land in Washington Township. The project involves rezoning the property to an Industrial – Research – Technology zoning district to allow for industrial and research facilities, including a data center. The proposal includes site-specific conditions and a reversion clause if the development is not completed within five years.

Original sector

Built Sector

Location

Country

United States of America (USA)

State

Michigan

City

Washington Township

Source

Source

Planet Detroit

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Data Center, Road

Article published date

2026-03-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project