logo

32 Mile Technical Campus Data Center

Sector: Raw Materials • Location: Washington Township, Michigan, United States

Source: WXYZ Channel 7

Project
Planned

Prologis is proposing the 32 Mile Technical Campus project, which would transform 312 acres of land into a technical campus and data center. The project involves rezoning the land from agricultural residential to industrial research technology. The location is south of 32 Mile Road and east of M-53 in Washington Township, Macomb County, Michigan. Residents have expressed concerns about environment

Status
Prospective
Sector
Raw Materials, Data Center, Road, Manufacturing (Industrial), Water Supply and Storage, Warehouse, Residential
Location
Washington Township, Michigan, United States of America
Updated
22 Jul 2026
Source
WXYZ Channel 7

ConstructChat

Ask ConstructChat about 32 Mile Technical Campus Data Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “32 Mile Technical Campus Data Center” is an infrastructure initiative in the Raw Materials sector, located in Washington Township, Michigan, United States. Taiyo aggregates data on it from WXYZ Channel 7.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Prologis is proposing the 32 Mile Technical Campus project, which would transform 312 acres of land into a technical campus and data center. The project involves rezoning the land from agricultural residential to industrial research technology. The location is south of 32 Mile Road and east of M-53 in Washington Township, Macomb County, Michigan. Residents have expressed concerns about environmental impacts, energy usage, and water usage plans.

Original sector

Built Sector

Location

Country

United States of America (USA)

State

Michigan

City

Washington Township

Source

Source

WXYZ Channel 7

URL

More Details

Record type

Project

Sector

Raw Materials, Data Center, Road, Manufacturing (Industrial), Water Supply and Storage, Warehouse, Residential

Article published date

2025-12-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project