logo
ProjectPlanned

320 MW AI Data Center Campus by BUZZ HPC

The owner, status and timeline of this project. A free account opens every field.

Source: TradingView

HIVE Digital Technologies' BUZZ HPC subsidiary plans to develop a 320-megawatt AI data center campus near Toronto capable of supporting more than 100,000 GPUs at full build-out. The project is expected to cost about CAD 3.5 billion with target deployment in the second half of 2027. The facility will use Ontario's electricity grid and closed-loop cooling systems designed to reduce water usage, and

Status
Prospective
Sector
Power Generation (CCGT), Water Supply and Storage, Data Center
Location
Toronto, Ontario, Canada
Updated
22 Jul 2026
Source
TradingView

ConstructChat

Ask ConstructChat about 320 MW AI Data Center Campus by BUZZ HPC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “320 MW AI Data Center Campus by BUZZ HPC” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Toronto, Ontario, Canada. Taiyo aggregates data on it from TradingView.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

HIVE Digital Technologies' BUZZ HPC subsidiary plans to develop a 320-megawatt AI data center campus near Toronto capable of supporting more than 100,000 GPUs at full build-out. The project is expected to cost about CAD 3.5 billion with target deployment in the second half of 2027. The facility will use Ontario's electricity grid and closed-loop cooling systems designed to reduce water usage, and is expected to create more than 800 construction jobs and additional permanent technical roles.

Original sector

Technology

Budget

Location

Country

Canada

State

Ontario

City

Toronto

Source

Source

TradingView

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Water Supply and Storage, Data Center

Article published date

2026-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project