325RPL Lab 316 Renovation
Sector: Power Generation (CCGT) • Location: Richland, Washington, United States of America
Source: Dodge USA
The Work consists of removal of existing fume hoods, casework, drop ceiling, and flooring. The casework, ceiling, and flooring will be replaced. A new fume hood will be purchased and installed. Electrical will be updated, new lighting fixtures will be installed and two access doors to laboratory will be replaced. Provide electrical power, ventilation, and cooling capability in the lab 316.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Work consists of removal of existing fume hoods, casework, drop ceiling, and flooring. The casework, ceiling, and flooring will be replaced. A new fume hood will be purchased and installed. Electrical will be updated, new lighting fixtures will be installed and two access doors to laboratory will be replaced. Provide electrical power, ventilation, and cooling capability in the lab 316. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
