33 Ashbury Overhead Wiring and Pole Replacement Project
Sector: Advanced Electronics • Location: San Francisco, California, United States of America
Source: SFMTA Projects
33 Ashbury Overhead Wiring and Pole Replacement Project Share this: Facebook Twitter LinkedIn Project Introduction 33 Stanyan Pole Replacement and Overhead Wire Reconstruction Project – Phase 2 began February, 2017 to reduce the on-going maintenance burden on this trolley coach line. Under the $5.3 Million Project approved by Board directors, Contractor Balfour Beatty Rail will replace the existi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | current |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | 33 Ashbury Overhead Wiring and Pole Replacement Project Share this: Facebook Twitter LinkedIn Project Introduction 33 Stanyan Pole Replacement and Overhead Wire Reconstruction Project – Phase 2 began February, 2017 to reduce the on-going maintenance burden on this trolley coach line. Under the $5.3 Million Project approved by Board directors, Contractor Balfour Beatty Rail will replace the existing 40+ years old trolley poles and overhead contact system that provides power to the Muni 33 Ashbury trolley coach line on 18th Street between Castro and Market Streets. This work also includes improving pedestrian safety and accessibility at 18th Street at Oakwood, Lapidge and Lexington streets by installing new ADA curb ramps. In partnership with PG&E, new LED street lights will be installed to increase safety apart of the project. The work from Mission to Castro Streets has been completed in 2018. The project will resume replacing the overhead wiring from Castro to Market Streets in fall 2018 and is estimated to be complete early 2019. Project Timeline Phase 1 Construction 2016 Completed Phase 2 Construction 2017-2018 Pending Expected Completion 2019 Pending Cost Estimate $5.3 Million Current Phase or Stage Construction Predicted Completion Spring 2019 Project Status Current Project Success On budget Improvements Pole and overhead wire replacement for better reliability Sidewalk improvements ADA wheelchair ramps LED lights Neighborhoods Mission Castro / Upper Market Contact Information Lolita Sweet Lolita.Sweet@sfmta.com 415.749.2460 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
