35 Eldon Hall Site Improvements
Sector: Commercial • Location: Kingston, Ontario, Canada
Source: Dodge USA
In particular the work includes, but is not necessarily limited to the following: 1. The installation and maintenance of hoarding, dust protection and construction signage around each phase of the work as described herein. 2. The installation and maintenance of ventilation and exhaust systems into and out of the work area as described herein. 3. Repair/replace/restore all areas damaged by construc
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial)
- Location
- Kingston, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 35 Eldon Hall Site Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In particular the work includes, but is not necessarily limited to the following: 1. The installation and maintenance of hoarding, dust protection and construction signage around each phase of the work as described herein. 2. The installation and maintenance of ventilation and exhaust systems into and out of the work area as described herein. 3. Repair/replace/restore all areas damaged by construction activity to a like new condition; specifically, the Contractor shall repair all damage resul... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Kingston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
