35-MW Solar Project in Choma
Sector: Power Generation (CCGT) • Location: Choma, Zambia
Source: Renewables Now
Zambian national power utility ZESCO has broken ground on a 35-MW solar project in Choma. The project is located in the villages of Munapuutu and Siamalambo and is expected to be finalized in eight months. It is developed by China Energy Engineering Group-Hunan Electric Power Design Institute.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Power Transmission, Solar, Government
- Location
- Choma, Zambia
- Updated
- 22 Jul 2026
- Source
- Renewables Now
ConstructChat
Ask ConstructChat about 35-MW Solar Project in Choma
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Zambian national power utility ZESCO has broken ground on a 35-MW solar project in Choma. The project is located in the villages of Munapuutu and Siamalambo and is expected to be finalized in eight months. It is developed by China Energy Engineering Group-Hunan Electric Power Design Institute. |
Original sector | Renewable Energy |
Location
Country | Zambia |
City | Choma |
Source
Source | Renewables Now |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Solar, Government |
Article published date | 2025-12-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
