logo

350 MW Solar Project with BESS

Sector: Energy Storage • Location: India

Source: Evertiq

Project
Awarded

Reliance NU Energies has secured a 350 MW solar project with a 175 MW/700 MWh Battery Energy Storage System (BESS) from SJVN. This project will enhance Reliance Power's portfolio by adding significant solar PV capacity and energy storage capabilities, ensuring reliable power supply to state distribution utilities.

Status
Closed
Sector
Energy Storage, Power Generation (CCGT), Solar
Location
India
Updated
22 Jul 2026
Source
Evertiq

ConstructChat

Ask ConstructChat about 350 MW Solar Project with BESS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “350 MW Solar Project with BESS” is an infrastructure initiative in the Energy Storage sector, located in India. Taiyo aggregates data on it from Evertiq.

Participants

Not available for this record.

Status

Original status

Awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Reliance NU Energies has secured a 350 MW solar project with a 175 MW/700 MWh Battery Energy Storage System (BESS) from SJVN. This project will enhance Reliance Power's portfolio by adding significant solar PV capacity and energy storage capabilities, ensuring reliable power supply to state distribution utilities.

Original sector

Energy

Location

Country

India

Source

Source

Evertiq

URL

More Details

Record type

Project

Sector

Energy Storage, Power Generation (CCGT), Solar

Article published date

2025-05-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project