350 MW Wind-Solar Hybrid Project Substation and Transmission Line
Sector: Power Generation (CCGT) • Location: Madhya Pradesh, India
Source: Saur Energy
Kshema Power secured an order from Oyster Green Hybrid Three Private Limited to develop a 33 kV/220kV AIS power substation and a 51-kilometre transmission line for a 350 MW wind-solar hybrid project in Madhya Pradesh. The project includes design, engineering, supply, installation, civil works, testing, and commissioning to ensure efficient grid integration of wind and solar generation.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Wind, Solar
- Location
- Madhya Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Saur Energy
ConstructChat
Ask ConstructChat about 350 MW Wind-Solar Hybrid Project Substation and Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Kshema Power secured an order from Oyster Green Hybrid Three Private Limited to develop a 33 kV/220kV AIS power substation and a 51-kilometre transmission line for a 350 MW wind-solar hybrid project in Madhya Pradesh. The project includes design, engineering, supply, installation, civil works, testing, and commissioning to ensure efficient grid integration of wind and solar generation. |
Original sector | Renewable Energy |
Location
Country | India |
State | Madhya Pradesh |
Source
Source | Saur Energy |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind, Solar |
Article published date | 2025-12-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
