36-Inch Water Transmission Main
Sector: Water Supply and Storage • Location: Laredo, Texas, United States of America
Source: Dodge USA
This project consists of approximately 5,000 LF of 36-inch or 42-inch water transmission main along Kearny St. It will connect to and continue an adjacent large diameter water main project on the east side of Zacate Crreek and end the Lyon Street Booster Pump Station.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment
- Location
- Laredo, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 36-Inch Water Transmission Main
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of approximately 5,000 LF of 36-inch or 42-inch water transmission main along Kearny St. It will connect to and continue an adjacent large diameter water main project on the east side of Zacate Crreek and end the Lyon Street Booster Pump Station. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Laredo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
