logo

3.6 MW Battery Energy Storage System at Vuteq Canada’s Woodstock Facility

One of 10,000+ projects Taiyo tracks in Ontario.

Source: The Manila Times

Project
Completed

A 3.6 MW / 7.2 MWh lithium-ion battery energy storage system installed at Vuteq Canada’s manufacturing facility in Woodstock, Ontario. The system supports industrial energy cost savings, demand response participation, and grid reliability. The project also included installation of six Level 2 electric vehicle chargers through Canada’s Zero Emission Vehicle Infrastructure Program.

Status
Closed
Sector
Electric Vehicles (EVs), Energy Storage, Power Generation (CCGT), Manufacturing (Industrial), Automotive, Commercial
Location
Woodstock, Ontario, Canada
Updated
22 Jul 2026
Source
The Manila Times

ConstructChat

Ask ConstructChat about 3.6 MW Battery Energy Storage System at Vuteq Canada’s Woodstock Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “3.6 MW Battery Energy Storage System at Vuteq Canada’s Woodstock Facility” is an infrastructure initiative in the Electric Vehicles (EVs) sector, located in Woodstock, Ontario, Canada. Taiyo aggregates data on it from The Manila Times.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 3.6 MW / 7.2 MWh lithium-ion battery energy storage system installed at Vuteq Canada’s manufacturing facility in Woodstock, Ontario. The system supports industrial energy cost savings, demand response participation, and grid reliability. The project also included installation of six Level 2 electric vehicle chargers through Canada’s Zero Emission Vehicle Infrastructure Program.

Original sector

Energy

Location

Country

Canada

State

Ontario

City

Woodstock

Source

Source

The Manila Times

URL

More Details

Record type

Project

Sector

Electric Vehicles (EVs), Energy Storage, Power Generation (CCGT), Manufacturing (Industrial), Automotive, Commercial

Article published date

2026-07-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project