3.6-MW/7.2-MWh BESS at Vuteq Canada factory
Sector: Electric Vehicles (EVs) • Location: Woodstock, Ontario, Canada
Source: Renewables Now
Canadian energy storage developer Peak Power Inc has brought into commercial operation a 3.6-MW/7.2-MWh lithium-ion battery energy storage system (BESS) at automotive supplier Vuteq Canada's factory in Woodstock, Ontario. The battery system is owned and financed by Madison Energy Infrastructure, with Peak Power managing its operation. The installation helps Vuteq reduce peak electricity costs and
- Status
- Closed
- Sector
- Electric Vehicles (EVs), Energy Storage, Power Generation (CCGT), Manufacturing (Industrial), Automotive, Commercial
- Location
- Woodstock, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Renewables Now
ConstructChat
Ask ConstructChat about 3.6-MW/7.2-MWh BESS at Vuteq Canada factory
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Canadian energy storage developer Peak Power Inc has brought into commercial operation a 3.6-MW/7.2-MWh lithium-ion battery energy storage system (BESS) at automotive supplier Vuteq Canada's factory in Woodstock, Ontario. The battery system is owned and financed by Madison Energy Infrastructure, with Peak Power managing its operation. The installation helps Vuteq reduce peak electricity costs and participate in Ontario's demand response programmes. The project also included the installation of six Level 2 electric vehicle chargers under Canada's Zero Emission Vehicle Infrastructure Program (ZEVIP), and upgrades to the facility's electrical infrastructure including two new switchgear bays. The BESS is managed through Peak Power's energy management platform to optimize charging and discharging. |
Original sector | Energy Storage |
Location
Country | Canada |
State | Ontario |
City | Woodstock |
Source
Source | Renewables Now |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Energy Storage, Power Generation (CCGT), Manufacturing (Industrial), Automotive, Commercial |
Article published date | 2026-07-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in Canada
- GO Rail Expansion - On-Corridor Works
- Moncton Water Treatment Facility
- Electric Vehicle Charging Station at Mount Forest Municipal Parking Lot
- Electric Vehicle Charging Station at Picton Municipal Parking Lot
- Bloomington GO Station
- Electric Vehicle Charging Station at Memorial Park Arena
- Electric Vehicle Charging Station at Northland Business Centre
- Electric Vehicle Charging Station at Pearson Airport - Terminal 3
